Getting power to a new U.S. data center before 2031-2032 is nearly impossible today — the grid's poles and wires, not generation capacity or cost, are the binding constraint on AI growth.

Key takeaways

Grid interconnection wait times doubled in 4 years — not cost, not generation

Grid interconnection wait times doubled in 4 years — not cost, not generation

  • Connection queue for new power projects grew from 15 months (20 years ago) to 45 months today.
  • Texas, the least-regulated US grid, won't fulfill a new data center power request before 2031-2032.

Being an 'interruptible load' cuts grid connection time from 7 years to 12-18 months

Being an 'interruptible load' cuts grid connection time from 7 years to 12-18 months

  • Texas June 2024 regulation: data centers that accept grid operator shutoff during peak get fast-tracked.
  • FERC then sent letters to the six other largest US grids telling them to adopt similar rules.

Fusion is regulated like hospital imaging machines, not fission reactors — a huge industry unlock

Fusion is regulated like hospital imaging machines, not fission reactors — a huge industry unlock

  • This regulatory decision, made quietly during COVID, means fusion projects avoid the multi-decade NRC licensing burden of fission plants.
  • The key distinction: fission can melt down if coolant fails; fusion simply stops — it is default-off, not default-on.

This Dig holds 4 more insights, 4 flashcards, and 3 quotes — free with your trial.

Unlock this Dig free

Start free with 100 credits · No card, no expiry

In this video

  1. 1mIntroduction to the energy landscape and technological potential
  2. 2mGuest introduction: Remez and his work on energy futures
  3. 5mAI's power hunger and the need for grid expansion
  4. 9mLog-linear relationship between compute and AI progress
  5. 15mMoving data centers to where energy is abundant
  6. 18mThe potential of large-scale solar projects and their costs
  7. 21mThe role of nuclear fission and fusion in future energy
  8. 34mThe analogy of cache and multitasking in energy management
  9. 40mThe scale of current and future solar installations
  10. 45mThe economics of GPUs, AI, and energy costs
  11. 50mLong-term prospects for solar, nuclear, and space-based energy

10 gawatt a year is like five or six launches of Starship a day.

Romez Naam